Start with one recently completed job similar to yours. Ask the factory to walk it from incoming board through print, conversion and final release. A visit is most useful when you can link what you see on the floor to the revision, material lot and inspection records for that same order.

1. Match the supplier, factory and contracting entity
Write down the legal name on the quotation, the production address and the entity that will sign the purchase order. If an exporter handles the contract and another company manufactures the boxes, document who controls the site, who approves changes and who owns corrective action. If your program requires certification, verify the legal entity, site, scope and status with the issuer or its registry. Record any difference before approving the supplier. See MY Packaging’s certificates for an example of the documents to request.
2. Follow the actual route for your box
A rigid gift set can involve printing the wrap, cutting board, wrapping the shell, fitting an insert and final assembly. A folding carton follows a different route. Have the factory mark each step as in-house or subcontracted and show the equipment, tooling and sample job record for the steps that affect your acceptance criteria. For an outsourced finish, ask how the factory controls the incoming lots and who can stop production if color or foil adhesion drifts.
3. Trace board and control substitutions
Pick a batch from the completed job and follow the incoming material label to the stores record and work order. Compare the supplier grade, caliper and lot to the approved specification. Ask who must authorize substitute material and how the change reaches purchasing, the line and the retained sample. If the warehouse can identify the material but cannot tie it to shipped cartons, put lot traceability on the corrective-action list.
4. Make the line show the current revision
Ask an operator to retrieve the current dieline, artwork and assembly instructions for the sampled job. Compare the revision on the job ticket, file and approved sample. Choose an item that changed, such as barcode placement or insert depth, and ask how the old tooling or artwork was withdrawn. An operator who can find the live version without relying on the sales team provides stronger evidence than a folder of undated PDFs.
5. Compare the first-off signoff with the release record
Look for measured checks at the first-off stage and after a meaningful setup change. For a printed folding carton, compare the approval sample with register, crease position and seam records. For an insert, check that fit was judged with the actual product or an agreed representative sample. Ask when QC can hold a batch, and trace one rejected lot through physical segregation, disposition and reinspection. The quality and manufacturing page provides context for discussing those checkpoints with MY Packaging.
6. Review capacity at the slowest process
Ask for a work-back schedule by process for your volume and pack-out date. A fast press leaves the same delivery risk if hand assembly, foil stamping or outsourced lamination is already booked. Compare the quotation’s planned lead time to the load on that step. Identify any action the buyer must complete, such as signing the color proof, before the slot can be held.
7. Give every open finding an owner and deadline
Proceed to sampling when the relevant production route and approval controls have evidence. Approve conditionally when a defined issue can be demonstrated closed before the first production lot. Hold qualification when the producing site, critical subcontractor, specification revision or release responsibility cannot be reconciled.
| Finding | Closure to request before approval |
|---|---|
| Freight carton label cannot be traced to a finished lot | Run a mock trace from a carton label to material, job revision and release record |
| Foil is outsourced and no approval record is available | Identify the operation and provide a signed finish reference plus incoming acceptance checks |
| Final inspection is signed but rejected units have no disposition | Show the hold, rework or rejection record and the subsequent release decision |
Ask for redacted job records if customer confidentiality limits access. Keep the job identifiers consistent across records so the evidence still connects. The ISO and IAF guidance on audit evidence explains the evidence-based approach behind this checklist.