Set the inspection criteria with the supplier before production begins. Use a signed physical sample, an approved specification and photos of acceptable and unacceptable defects. Place checks where a problem can still be corrected: incoming materials, first-off production, in-process conversion and final release.

1. Write the acceptance plan on the order
Identify the SKU, version, units and lots. Define who inspects, what equipment is used, how units are selected and which finding can hold a lot. Use a lot acceptance plan agreed by both sides when the inspection will use sampling. Set separate criteria for fit, function, cosmetics, barcode readability and quantity. Avoid instructions such as “good color” that two inspectors can interpret differently.
2. Verify the incoming paperboard and components
Compare material labels with the agreed mill grade, finish, caliper and colour. Verify inserts, magnets or closures when the design calls for them. Check that the work order keeps the approved grade and allowed substitutions clear. If two similar boards differ in caliper or back shade, label and segregate them so cutting cannot mix the stock.
3. Release a production first-off
Measure the first piece from the production setup. Fit the actual product or the agreed representative units, verify key dimensions and close it in the planned sequence. Check revision, artwork orientation, registration and critical crease locations. Sign off the first-off before the full run. Repeat the relevant checks after a change in material, die, press setup or revision.
4. Inspect conversion and assembly while the line is running
Look for score cracks, uneven glue, skew, crushed corners, loose inserts and warped panels. For a carton intended for automatic packing, run samples through the equipment or an agreed representative check. If a seam starts to open, record the affected time window and put that interval’s output on hold while the cause is checked. Pull follow-up samples from both sides of the corrected setup.
5. Check print and barcode with a defined method
Compare finished pieces with the approved color reference under the agreed lighting. Inspect foil edges, lamination and small reversed text. Scan each artwork version to confirm the encoded data matches the SKU. When the retailer requires a barcode grade, arrange verification with the applicable method and equipment. A functional shop-floor scan and formal print-quality verification answer different questions. See GS1’s barcode creation and printing guidance for examples of production controls.
6. Verify the packed lot at final release
| Check | Evidence to record |
|---|---|
| Fit and closing | Sample positions, actual measurements and photos of fit at critical points |
| Artwork and condition | SKU, revision, reference and examples of any defect observed |
| Count and markings | Units per carton, carton sequence, lot labels and any partial carton |
| Pack-out condition | Sealed master carton, insert placement and assigned pallet pattern if used |
Select the agreed samples across the lot. Reconcile the quantity and the label or packing list with the purchase order before releasing the shipment.
7. Contain failures and confirm disposition
Keep affected stock separate with a hold label or equivalent control. Record who decides between rework, replacement or a buyer-approved concession. After correction, inspect the affected attributes again against the same specification. Maintain the record alongside the signed sample so repeat orders can incorporate the updated control. Use the quality and manufacturing page to specify the check stages and release evidence you want for your order.